Reduce load to sewer system

NAIAD Case Studies: Glinščica Demonstration Site (Ljubljana, Slovenia)

Glinščica catchment

The aim of Slovenian demo is to prepare a comparison of Nature based solutions and grey scenarios for the Glinščica catchment area, valuate the ecosystem services provided by implementation of restoration and management measures developed within the project and to develop and deploy economic and/or financial instruments (in the form of nature assurance schemes) for effective business models in the field of ecosystem services, green infrastructure and river restoration that would highlight the importance of understanding the value of ecosystems in the long run.


UoG Green Screens

Green Screen Experiment

To investigate the extent to which green screens (helix hedera) may provide regulatory ecosystem services. This includes acting as a buffer against airborne particulate pollution and reducing rainfall runoff rates compared to normal plywood construction hoarding. 



Integrated green grey infrastructure (IGGI) - Green screen guard rail.

Air quality in urban areas is a known issue for health and quality of life. Motorised vehicles produce a range of pollutants that can affect human health. These include very small particles emitted from exhaust (especially from diesel-fuelled vehicles), and from wear-and-tear on brakes and tyres. If inhaled these particles can cause a range of both short-term and more chronic health problems, including increased chances of death from respiratory and cardiovascular disease. This Particulate Matter (PM) is measured in microns (one micron is one millionth of a metre). Health concerns start...


Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...


Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...

Urban Regeneration in the District of Ferencvaros (Budapest)

Közösségi Park - Google Maps
  • Complex development of a run-down part of the district (Refurbishment/ urban renewal)

The target area is located in the heart of Budapest. This pioneer project was realized before urban planners would have recognized the importance of urban green spaces. At the same time this project brought measurable market benefits (appreciation of occupied property), also helped to create a neighbourhood community. The project was a succesful tool in mitigating the negative effects of urban heat island, and summer air temperatures significantly decreased.

...


Green Roof of Aimé Césaire School Complex

Aimé Césaire Primary School: A Garden Home (Source: urbannext.net/aime-cesaire-primary-school)

In 2013, an experimental and educational project, conceived as a garden home for a school, was built at the heart of the green district known as ‘Duke’s Meadow’ on the Île de Nantes. The building’s roof was covered by 2,700 square meters of natural dunes.

The objective is to create a green roof, relying heavily on a phytosociological approach to plant colonization and high biodiversity, but also a site that is easy to manage.

The originality of its green roof results from a co-construction between architects and landscape designer. Its qualities are undeniable, and this...


Bézannes Joint Development Zone (Reed Bed Park), Storm-water Management Solution

Entrance of the Reed bed Park (Parc de la Roselière)
  • Rainwater management of a 172ha area in response to a waterproofing construction

This NbS is a construction ex nihilo of a landscaped park as alternative stormwater management solution to a traditionnal civil engineering management (tubes). It takes place in a 172ha area in the city of Bézannes (Reims Métropole). This project has been implemented in response to the waterproofing of this area (strong urbanisation level).

The project is caracterized by an artificial river leading to a permanent lagoon and a reed bed. Then a wetland manage the water...


Application of Eco:Actuary in the Thames catchment, UK: A series of tools to operationalise strategic planning and investment for Natural Flood Management. H2020 NAIAD Project.

EcoActuary: an open-access catastrophe model capable of assessing the impact of green infrastructure on local and downstream assets at risk of flood.

Using the widely used Policy Support System tools at www.policysupport.org as a basis, we built an insurance industry-relevant policy support system called Eco:Actuary. The objective of this project is to to co-develop and test the Eco:Actuary with NAIAD project partners & stakeholders in the fluvial non-tidal Thames as a DEMO catchment in the NAIAD project. 

EcoActuary is an open-access catastrophe model capable of assessing the impact of NbS on local and downstream assets at risk of flood.  It simulates a minimum of 1200 spatial...


Pages