Increase infiltration / Water storage

Komppasuo peat extraction area: healing and new usage strategies

Komppasuo peat extraction site (photo: Jani Antila, Tapio Oy)

After peat extraction in the Komppasuo bog, Finnland, was initiated in 1987, it was stopped in 2021 and restoration projects are aiming at bringing the landscape back to a functioning and sustainable ecosystem. The objective is to establish wetland conservation areas from previously drained peatlands, to set up constructed wetlands for water purification, increasing water quality, increasing the amount of suitable habitats for migratory fish and the endangered freshwater pearl mussel (Margaritifera margaritifera) as well as increasing the areas suitable for recreation.

This case...


Greening the Sorraia valley floodplain

Sorraia floodplain to be restored (photo: Cláudia Brandao)

Implement the best configurations for greening elements (type, location, spatial configuration),  in the Sorraia floodplain valley, that maximize biodiversity (woody structure, ants, birds and chiropterans) and ecosystem services (biological control, nutrient and sediment removal, pollination, habitat for species) without detriment of economic incomes for farmers.  During the planning stage, a model for optimization will be developed, and different scenarios of agriculture development and global changes tested, together with stakeholders and administration.  

This case study is one...


Floodplain restoration in the Lima catchment, Portugal

Invasive species control in the Lima floodplains (photo: Patricia M. Rogríguez-Gonzáles)

After around 21ha of floodplain area were passively and actively restored under the LIFE FLUVIAL project, an enlarging of the intervention area is now being implemented. The floodplain forest restoration intends to develop/demonstrate an ecological restoration approach for fluvial floodplains transferable to lowlands at the biogeographic region (NW of Iberian Peninsula). The case study also aims at taking local stakeholders on board and reconcile the protection of priority habitats with traditional cattle production. The case study will also integrate an educational dimension and aims at...


Monitoring the success of Liberty Island, Hungary

Liberty Island in the Danube River, Hungary

The creation of a long-term, sustainable conservation model for white willow (Salicion albae) alluvial forests in Hungary and a more near-natural flow regime of the Danube. A core aim was to eliminate or mitigate the factors that threaten the habitats of community interest. 

This case study is one of 17 that are part of the EU Horizon2020 project MERLIN - Mainstreaming Ecological Restoration of freshwater-related ecosystems in a Landscape context: INnovation, upscaling and transformation. Within MERLIN, the project area of the Liberty Island restoration is revisited to learn from...


Restoring Danube floodplains in Austria

Danube estuary Tiergartenarm (Austria) (photo viadonau)

Riverbank restorations are implemented on a stretch of approximately 800m shoreline of the Danube to increase lateral river-floodplain connectivity and the functioning of the floodplain as an ecosystem. The aim is to reach a good ecological status of the river as well as good navigation status. The case study works with an adaptive management process and adresses multiple pressures (ecological deficits, security of navigation, riverbed deepening, flood protection).

This case study is one of 17 that are part of the EU Horizon2020 project MERLIN - Mainstreaming Ecological Restoration...


Peatlands of Bosnia and Herzegovina: Neretva-Trebisnjica and Hutovo Blato

Peatland sites within carstic catchments in Bosnia and Herzigovina are to be restored through channel restoration and rewetting, thereby protecting these hotspots for (endemic) biodiversity. The case study aims at achieving an amicable transition from the current heavy hydropower usage and peatland extraction to more near-natural, healthy ecosystems. 

This case study is one of 17 that are part of the EU Horizon2020 project MERLIN - Mainstreaming Ecological Restoration of freshwater-related ecosystems in a Landscape context: INnovation, upscaling and transformation


Territorial Ordering Plan (POT) of Bogotá 2022-2035 "El reverdecer de Bogotá"

On September 2021, the mayor and the District Planning Secretary presented the proposal for the Territorial Ordering Plan (POT ) 2022-2035. This POT responds and involves the Sustainable Development Goals in land use planning. Based on these areas, the plan incorporates on four pillars, including sustainable mobility, greening, a care system for women and sustainable economic economy.


INVENTORY OF NATURE-BASED INNOVATIONS

Inventory of nature-based innovations

The Erasmus+ project „Nature-Based Innovations for Urban Forest and Rainwater Management” supports communities and local authorities in combating climate change through the identification of good practices and the dissemination of innovative solutions and manuals addressed to local authorities, stakeholders, and associations to improve policies and practices to  counter climate change from an environmental, social, and economic point of view.


Watershed-scale impacts of stormwater green infrastructure on hydrology, nutrient fluxes, and combined sewer overflows in the mid-Atlantic region

Use of vegetation in urban areas in the Mid-Atlantic watersheds of Washington DC, Montgomery County and Baltimore County MD, has reduced flooding and nutrient runoff. The ‘stormwater green infrastructure’ in these municipalities includes green roofs, bioswales, rain gardens and stormwater ponds. By increasing infiltration and groundwater recharge, and/or evaporation, they reduce the volume of run-off that can contribute to floods.


Pages