Shanxi Qixian Wetland Park Restoration Project -Experience- AFD financed

Project introduction:

The Changyuanhe river is in Qixian, Jinzhong City, Shanxi Province, in North and Middle China and become the main axis of the project, both by its cultural and ecological important for the country. In the past, there were large areas of marsh wetlands along the river, which can regulate and enrich the ecological diversity with good water power. Today the contrast between the upstream natural area (which is still well preserved) and the downstream area (which is dry for four months of the year) is astonished. The project aims to afforest the 30km river...




Greater Easterhouse Green and Blue Network

Green Infrastructure Strategic Intervention: Greater Easterhouse

The project will involve the creation of two green-blue infrastructure corridors which will connect to the large Seven Lochs Wetland Park. The green networks will provide communities in the Greater Easterhosue area with a green connection to the larger wetland park but will also provide them with a local greenspace. 

Key aims:

  • Create and improve multi-functional and connected greenspaces 
  • Creation of habitats
  • Reduce flood risk
  • Improve health and well-being of local communities

Bird-friendly garden of Szeged

The initiative was the idea of enthusiastic parents and teachers, who were really keen on the close-nature surroundings of their children. They worried about the local air quality as a four-lane highway goes near to the school. The discussions with the involvment of experts started in 2016 and the first steps were made in community collaboration. Birdnests and feeders were made by the children as well most of the plantation was made by them with the help and guidance of adults.

The schoolgarden and its surroundings were surveyed for birds to select the most appropriate plant types....


Promenade along river Danube

  • Develop a concept and implement numerous pilot projects on the riverbank

The main purpose of the project is to design a promande among the Danube quays in Budapest, planting plants, building installations, and awareness rising. The goal is the sharing of the sensation of the Danube in the city, recommending the daily utilization of the river side to citizens.

The project is a good example for the implementation of strategic NBSs, with putting great emphasis on the corporate development and implementation, by creating networks. 

The...


Blue Beach Case Study of Valenton (Val de Marne, France), Fertile Soil Construction by Using Recycled Materials

Blue Beach Park Overview

Soil construction with wastes. 

...


Urban Challenges:

1. Climate issues: Climate adaptation
2. Urban water management and quality: Urban water management and quality
4. Urban space and Biodiversity: Urban space management 
5. Urban Regeneration and Soil: Soil management
7. Public health and well-being: Quality of life, Health
8. Environmental justice and social cohesion: Social cohesion
11. Green economy: Circular economy, Direct economic value of NBS...


Bézannes Joint Development Zone (Reed Bed Park), Storm-water Management Solution

Entrance of the Reed bed Park (Parc de la Roselière)
  • Rainwater management of a 172ha area in response to a waterproofing construction

This NBS is a construction ex nihilo of a landscaped park as alternative stormwater management solution to a traditionnal civil engineering management (tubes). It takes place in a 172ha area in the city of Bézannes (Reims Métropole). This project has been implemented in response to the waterproofing of this area (strong urbanisation level).

The project is caracterized by an artificial river leading to a permanent lagoon and a reed bed. Then a wetland manage the water...



Flood Retention Basins of Lura River, Como Province

Retention basin of Lura park (1)
  • River bank renaturation and stabilization through live staking and vegetated dikes

  • Riparian afforestation

  • Phytodepuration basins

  • ​Zero-energy flood retention system (no pumping needed)

The project consists of the implementation of two rolling basins connected by an open air ditch and a pond filled with ground water. The basins will be temporarely flooded by Lura river during intense rainy periods through natural inlet from the river bed,...