Reduce flood risk

Greater Easterhouse Green and Blue Network

Green Infrastructure Strategic Intervention: Greater Easterhouse

The project will involve the creation of two green-blue infrastructure corridors which will connect to the large Seven Lochs Wetland Park. The green networks will provide communities in the Greater Easterhosue area with a green connection to the larger wetland park but will also provide them with a local greenspace. 

Key aims:

  • Create and improve multi-functional and connected greenspaces 
  • Creation of habitats
  • Reduce flood risk
  • Improve health and well-being of local communities

Integrated green grey infrastructure (IGGI) - Green screen guard rail.

Air quality in urban areas is a known issue for health and quality of life. Motorised vehicles produce a range of pollutants that can affect human health. These include very small particles emitted from exhaust (especially from diesel-fuelled vehicles), and from wear-and-tear on brakes and tyres. If inhaled these particles can cause a range of both short-term and more chronic health problems, including increased chances of death from respiratory and cardiovascular disease. This Particulate Matter (PM) is measured in microns (one micron is one millionth of a metre). Health concerns start...


Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...


Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...

Fernbrae Meadows Urban Park

Green Infrastructure Strategic Intervention: Fernbrae Meadows

The land was in a vacant and derelict state and safety concerns were raised due to vandalisation, fly tipping, vehicle abandonment and fires. The conversion of the site into a new urban park presented an opportunity to address the anti-social behaviour and make the site a desirable area for positive activities and community development. South Lanarkshire Council provided the match funding for the project and applied for funding from the Green Infrastructure Strategic Intervention (GISI), which was granted in 2017. A ‘friends of’...



Blue Beach Case Study of Valenton (Val de Marne, France), Fertile Soil Construction by Using Recycled Materials

Blue Beach Park Overview

Soil construction with wastes. 

...


Urban Challenges:

1. Climate issues: Climate adaptation
2. Urban water management and quality: Urban water management and quality
4. Urban space and Biodiversity: Urban space management 
5. Urban Regeneration and Soil: Soil management
7. Public health and well-being: Quality of life, Health
8. Environmental justice and social cohesion: Social cohesion
11. Green economy: Circular economy, Direct economic value of NbS...


Bézannes Joint Development Zone (Reed Bed Park), Storm-water Management Solution

Entrance of the Reed bed Park (Parc de la Roselière)
  • Rainwater management of a 172ha area in response to a waterproofing construction

This NbS is a construction ex nihilo of a landscaped park as alternative stormwater management solution to a traditionnal civil engineering management (tubes). It takes place in a 172ha area in the city of Bézannes (Reims Métropole). This project has been implemented in response to the waterproofing of this area (strong urbanisation level).

The project is caracterized by an artificial river leading to a permanent lagoon and a reed bed. Then a wetland manage the water...


Flood Retention Basins of Lura River, Como Province

Retention basin of Lura park (1)
  • River bank renaturation and stabilization through live staking and vegetated dikes

  • Riparian afforestation

  • Phytodepuration basins

  • ​Zero-energy flood retention system (no pumping needed)

The project consists of the implementation of two rolling basins connected by an open air ditch and a pond filled with ground water. The basins will be temporarely flooded by Lura river during intense rainy periods through natural inlet from the river bed,...


Environmental recovery of a quarry ATEg20 - Pozzuolo Martesana, Truccazzano

Quarry restoration ATEg20

This project consists in two main areas :
- the northern portion : object of the first phases of extraction ended in 2007
- the southern portion : subject of the cultivation plan and recovery of recent years
The proposed project involves the areas cultivated in the northern part. It forecast an environmental naturalistic recovery and the conclusion of the overall environmental recovery of the entire extractive area.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use;
•...


Pages