Increase quality and quantity of green and blue infrastructures

Project Coastbusters Biogenic reefs concept

Coastbusters

 The public-private Coastbusters consortium aims to study and translate desired coastal protection functionality into designs that make use of the capability of ecosystem engineering species. In other words, does ecosystem creation and Nature-based Solutions’ technical design provide a more sustainable and cost-effective management approach to conventional coastal engineering? To answer this question, two Coastbusters research projects are executed, funded by the Flemish agency for Innovation and entrepreneurship (VLAIO) and co-funded by the industry (Dredging International part of the...


Green indoor and outdoor walls

  • The experimental features of this NbS are intended as replicable examples in enhancing urban environments and improving living conditions of inhabitants.
  • Working with schools to spread the knowledge about NbS to users of the buildings and raising awareness about the importance of plants in everyday life.
  • Promoting the collaboration with school teachers and staff of the homeless shelter to schedule activities that supported learning “science” disciplines, as well as Italian language skills, civic education and social studies.
  • Consulting a nursery to achieve
  • ...

Las Llamas Park, Santander: Wetlands and permeable car parks

Panoramic view of the Las Llamas Park. In the right, the east side with the Palacio de Deportes, at the left, the west side with the Arenas bridge.

The D4RUNOFF project’s goal is to create a novel framework for preventing and managing diffuse pollution from urban water runoff. This will be achieved by designing hybrid nature-based solutions (NbS) and a data-driven AI-platform to support policy and decision making.

The case studies have been identified for the implementation and validation of this approach in varying environments. The replicability of these results will then be assessed at five replication sites. The Las Llamas Park in Santander has been chosen as one of three case study sites as part of the D4RUNOFF project.


Amplification of the self-purification capacity of a small urban river using a natural solution to reduce the effect of urban stormwater degradation on its ecological status (France)

Porous ramp operating at medium flow with  sand accumulation upstream

Ecohydrological engineering is used here to enhance the self-purification capacity of a small stream polluted by urban rainfall discharges. The demonstration site, realized in collaboration with the stakeholders, shows the positive effect on the chemical quality of the stream


Triple infiltration basin and greenery regeneration in the square of Oblęgorska / Widok Street in Łódź (Poland)

The final look of the ATENAS square. 

An implementation focused on combining blue and green infrastructure, with predominant use of native species and minimizing maintenance effort.

Key aims:

  • demonstrate the integration of blue solutions into green design;
  • create a pilot implementation of the infiltration basin as an example of best practice and a source of know-how;
  • build the trust in NbS;
  • initiate the restoration of water cycle in the Łódka River catchment.

    To Ally Technology, Nature and Society for integrated urban water management: ATENAS

    ATENAS project logo

    AteNas is built around  3 demonstration sites, covering urban and periurban zones of Łódź, Lyon and Vantaa/Helsinki and sharing the challenge of enabling water to citizens and nature, both in terms of quality and quantity.

    Utilize of cities water resources to secure regulating ecosystem services, enable Nature-Based Solutions, and enhance adaptive capacity to global changes.






    Pages