Developing climate change mitigation

NAIAD Case Studies: Glinščica Demonstration Site (Ljubljana, Slovenia)

Glinščica catchment

The aim of Slovenian demo is to prepare a comparison of Nature based solutions and grey scenarios for the Glinščica catchment area, valuate the ecosystem services provided by implementation of restoration and management measures developed within the project and to develop and deploy economic and/or financial instruments (in the form of nature assurance schemes) for effective business models in the field of ecosystem services, green infrastructure and river restoration that would highlight the importance of understanding the value of ecosystems in the long run.


Integrated green grey infrastructure (IGGI) - Green screen guard rail.

Air quality in urban areas is a known issue for health and quality of life. Motorised vehicles produce a range of pollutants that can affect human health. These include very small particles emitted from exhaust (especially from diesel-fuelled vehicles), and from wear-and-tear on brakes and tyres. If inhaled these particles can cause a range of both short-term and more chronic health problems, including increased chances of death from respiratory and cardiovascular disease. This Particulate Matter (PM) is measured in microns (one micron is one millionth of a metre). Health concerns start...


Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...


Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...


Urban Public Space Refurbishment, Szeged City

  • Mitigate heat-island effect thanks to the use of NbS
  • Priorities pedestrian approach along the very busy street of Kölcsey and at the Reök Palace Square

Szeged is a mid-size historic city in the south of Hungary, the temperature is usually higher than in other similar-sized cities in the country. The goal of this project was to reduce the effects of the urban heat island in a very busy street with a lot of cars and shops. The idea was to increase the green area, plant trees, creating a more pleasant space for the pedestrians. The...


Urban Natural Park, Based on Natural, Historical and Cultural Heritage Promotion and Eco-Citizenship

Strasbourg municipality
  • Creation of an urban natural park as a metropolitan governance tool
  • Encourage sustainable territorial development based on natural, historical and cultural heritage promotion, and eco-citizenship
  • Deliver sustainable solutions at a large scale to maximize benefits for society and the environment

The action encourages sustainable territorial development based on natural, historical and cultural heritage promotion and eco-citizenship. The governance is based on a charter included in the Local Urbanism Plan...


Ecological Restoration & Local Sustainable Fishing by Immersing artificial reefs - PRADO Reefs Project

Artificial reefs - Prado bay (3)

Ecological restoration by immersing diverse artificial reefs to provide shelters and habitats to marine species. The aim of the project is to diversify and regenerate marine natural resources in order to both make local fishing durable and ecological restoration.

  • Protect and provide long term benefits related to biodiversity and then to all the economical activities (fishery, tourism) linked in.

Bézannes Joint Development Zone (Reed Bed Park), Storm-water Management Solution

Entrance of the Reed bed Park (Parc de la Roselière)
  • Rainwater management of a 172ha area in response to a waterproofing construction

This NbS is a construction ex nihilo of a landscaped park as alternative stormwater management solution to a traditionnal civil engineering management (tubes). It takes place in a 172ha area in the city of Bézannes (Reims Métropole). This project has been implemented in response to the waterproofing of this area (strong urbanisation level).

The project is caracterized by an artificial river leading to a permanent lagoon and a reed bed. Then a wetland manage the water...


Flood Retention Basins of Lura River, Como Province

Retention basin of Lura park (1)
  • River bank renaturation and stabilization through live staking and vegetated dikes

  • Riparian afforestation

  • Phytodepuration basins

  • ​Zero-energy flood retention system (no pumping needed)

The project consists of the implementation of two rolling basins connected by an open air ditch and a pond filled with ground water. The basins will be temporarely flooded by Lura river during intense rainy periods through natural inlet from the river bed,...


Pages