Greater ecological connectivity across urban regenerated sites

Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...


Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...

Fernbrae Meadows Urban Park

Green Infrastructure Strategic Intervention: Fernbrae Meadows

The land was in a vacant and derelict state and safety concerns were raised due to vandalisation, fly tipping, vehicle abandonment and fires. The conversion of the site into a new urban park presented an opportunity to address the anti-social behaviour and make the site a desirable area for positive activities and community development. South Lanarkshire Council provided the match funding for the project and applied for funding from the Green Infrastructure Strategic Intervention (GISI), which was granted in 2017. A ‘friends of’...



Urban Regeneration in the District of Ferencvaros (Budapest)

Közösségi Park - Google Maps
  • Complex development of a run-down part of the district (Refurbishment/ urban renewal)

The target area is located in the heart of Budapest. This pioneer project was realized before urban planners would have recognized the importance of urban green spaces. At the same time this project brought measurable market benefits (appreciation of occupied property), also helped to create a neighbourhood community. The project was a succesful tool in mitigating the negative effects of urban heat island, and summer air temperatures significantly decreased.

...


Promenade along river Danube

  • Develop a concept and implement numerous pilot projects on the riverbank

The main purpose of the project is to design a promande among the Danube quays in Budapest, planting plants, building installations, and awareness rising. The goal is the sharing of the sensation of the Danube in the city, recommending the daily utilization of the river side to citizens.

The project is a good example for the implementation of strategic NBSs, with putting great emphasis on the corporate development and implementation, by creating networks. 

The...


Urban Natural Park, Based on Natural, Historical and Cultural Heritage Promotion and Eco-Citizenship

Strasbourg municipality
  • Creation of an urban natural park as a metropolitan governance tool
  • Encourage sustainable territorial development based on natural, historical and cultural heritage promotion, and eco-citizenship
  • Deliver sustainable solutions at a large scale to maximize benefits for society and the environment

The action encourages sustainable territorial development based on natural, historical and cultural heritage promotion and eco-citizenship. The governance is based on a charter included in the Local Urbanism Plan...


Quay Garden Project - Habitats for Local Species on a City Center River

Quay Gardens - Habitats for local species
  • Implementation of vegetated rafts as habitats for local species on a city center river
  • Using Bio-sourced materials

It aims to implement artificial shelters for fauna (nesting box, insect hotels, artificial spawning areas…) and vegetation supports were installed. Wooden terraces were also installed to allow citizens to enjoy and observe biodiversity. This project is both thought for biodiversity and for citizens and finaly allow cohabitation between them.


Environmental recovery of a quarry ATEg20 - Pozzuolo Martesana, Truccazzano

Quarry restoration ATEg20

This project consists in two main areas :
- the northern portion : object of the first phases of extraction ended in 2007
- the southern portion : subject of the cultivation plan and recovery of recent years
The proposed project involves the areas cultivated in the northern part. It forecast an environmental naturalistic recovery and the conclusion of the overall environmental recovery of the entire extractive area.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use;
•...


Environmental recovery of a quarry ATEg32 - Gaggiano, Trezzano sul Naviglio, Zibido San Giacomo

Quarry restoration ATEg32

This project aims to include : 
• transformation of some portions of agricultural land in wooded strips and recovery of some rows, that were not in a good state of preservation;
• creation of a new area for the relocation of the working installations;
• fulfillment of the existing ecological network and hiding/masking of the extractive areas;
• realization of set-aside fauna;
• realization of a cane thicket with the use of lime arising from the washing of extracted gravel and sands;
• realization of areas for activities with canoe
• creation of an...


Pages