Increase quality and quantity of green and blue infrastructures

ECO-Park development (Balaton lake) of Balatonfűzfő city

Eco-Park of Balatonfűzfő
  • Development of an ecological park at the lake Balaton

The plans of the municipality and the local civic organzation were to develop a pleasant, ecological park filled with different kind of leisure activities from the neglected gulf.

The objective is a comprehensive reconstruction of the area in Balatonfűzfő, from Fövenyfürdő Beach to Tobruki Beach is enabling the semi-natural utilization of the area near the city and near the lake. This project has two phases:

  1. The first phase a semi-natural promenade with special playground was created
  2. ...

Urban Natural Park, Based on Natural, Historical and Cultural Heritage Promotion and Eco-Citizenship

Strasbourg municipality
  • Creation of an urban natural park as a metropolitan governance tool
  • Encourage sustainable territorial development based on natural, historical and cultural heritage promotion, and eco-citizenship
  • Deliver sustainable solutions at a large scale to maximize benefits for society and the environment

The action encourages sustainable territorial development based on natural, historical and cultural heritage promotion and eco-citizenship. The governance is based on a charter included in the Local Urbanism Plan...


"Séqué" Eco-District Building (Bayone City)

"Séqué" Eco-District - Architect view
  • Construction of an eco-district with ecological networks and biodiversity as starting point

Design and construction of an eco-district with the ecological networks and biodiversity as starting point. The implementation of this project is based on environmental approach to urban planning. The district is an environmentally-friendly project and favors collective housing to preserve green areas.

This NBS is also combined with other environmental friendly solutions: Bio-sourced materials - Renewable energy system (solar panels, etc.).


Blue Beach Case Study of Valenton (Val de Marne, France), Fertile Soil Construction by Using Recycled Materials

Blue Beach Park Overview

Soil construction with wastes. 

...


Urban Challenges:

1. Climate issues: Climate adaptation
2. Urban water management and quality: Urban water management and quality
4. Urban space and Biodiversity: Urban space management 
5. Urban Regeneration and Soil: Soil management
7. Public health and well-being: Quality of life, Health
8. Environmental justice and social cohesion: Social cohesion
11. Green economy: Circular economy, Direct economic value of NBS...



Flood Retention Basins of Lura River, Como Province

Retention basin of Lura park (1)
  • River bank renaturation and stabilization through live staking and vegetated dikes

  • Riparian afforestation

  • Phytodepuration basins

  • ​Zero-energy flood retention system (no pumping needed)

The project consists of the implementation of two rolling basins connected by an open air ditch and a pond filled with ground water. The basins will be temporarely flooded by Lura river during intense rainy periods through natural inlet from the river bed,...


Operatie STEENBREEK

Operation Stone Break (Dutch wordplay) - Source : Operatie SteenBreek Fondation

Operatie Steenbreek  is a foundation that organizes awareness raising campaigns and offers assistance with regards to greening private gardens. Many gardens and streets in the Netherlands are covered with tiles that cannot absorp the rainwater from heavy rainfall.

The idea behind the initiative is to encourage citizens to remove the tiles and stones from their gardens/backyards and replace it with grass, plants and trees for better drainage and to increase the biodiversity.

Thanks to an app., citizens can be adviced and exchange plants with neighbours. Citizens can...


LEAFSKIN® Green Shady Structure

Green roof LEAFSKIN. Source: https://www.singulargreen.com/el-proyecto-urban-greenup-cumple-un-ano/

LEAFSKIN® is an ultralight green roof set up over pedestrian streets or squares, in order to create shadow areas in urban spaces.  

The tecnhology can also provide interesting implimentation like carring lighting system or  advertising on the bottum. 

Description of the NBS

The NBS is composed by three main elements:

  1. The facilities room. It is an unused newspaper kiosk, where there will be installed the irrigation system machines. An irrigation pipe is coming from this kiosk to the structures and a duct with the excess water returns back
  2. ...

Application of Eco:Actuary in the Thames catchment, UK: A series of tools to operationalise strategic planning and investment for Natural Flood Management. H2020 NAIAD Project.

EcoActuary: an open-access catastrophe model capable of assessing the impact of green infrastructure on local and downstream assets at risk of flood.

Using the widely used Policy Support System tools at www.policysupport.org as a basis, we built an insurance industry-relevant policy support system called Eco:Actuary. The objective of this project is to to co-develop and test the Eco:Actuary with NAIAD project partners & stakeholders in the fluvial non-tidal Thames as a DEMO catchment in the NAIAD project. 

EcoActuary is an open-access catastrophe model capable of assessing the impact of NBS on local and downstream assets at risk of flood.  It simulates a minimum of 1200 spatial...


Green roof in the Village Elves Hideaway

Green roof in the Village Elves Hideaway

Favoring of environmentally sustainable materials and solutions has been the main objective in the construction and services of Village Elves Hideaway. The newest ecological knowledge is integrated with mythology of Lapland in order to produce fascinating stories for guided tours. For this reason the green roof of Wise Elf´s house was built.

The construction was carried out as a part of larger project ‘From forest Baths to Green Roofs’ which aimed at new practices in nature-based services that enhance the wellbeing of travelers. 


Pages