Reduce run-off

Halfway Community Park

Green Infrastructure Strategic Intervention: Halfway Community Park

The area is poorly connected to green space and in 2013 Glasgow City Council’s open space audit concluded that the site was of poor quality and limited functionality. The towers consist of mainly family flats and over 20% of the population are from an ethnic minority background. The project proposal was developed with community needs considered and 88% of locals indicated they very much wanted to see changes made to the space. There was an obvious need for a functional space which enhanced the quality of life for a community living in one of the most disadvantaged neighbourhoods in...


Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...


Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...

Fernbrae Meadows Urban Park

Green Infrastructure Strategic Intervention: Fernbrae Meadows

The land was in a vacant and derelict state and safety concerns were raised due to vandalisation, fly tipping, vehicle abandonment and fires. The conversion of the site into a new urban park presented an opportunity to address the anti-social behaviour and make the site a desirable area for positive activities and community development. South Lanarkshire Council provided the match funding for the project and applied for funding from the Green Infrastructure Strategic Intervention (GISI), which was granted in 2017. A ‘friends of’...


Blue Beach Case Study of Valenton (Val de Marne, France), Fertile Soil Construction by Using Recycled Materials

Blue Beach Park Overview

Soil construction with wastes. 

...


Urban Challenges:

1. Climate issues: Climate adaptation
2. Urban water management and quality: Urban water management and quality
4. Urban space and Biodiversity: Urban space management 
5. Urban Regeneration and Soil: Soil management
7. Public health and well-being: Quality of life, Health
8. Environmental justice and social cohesion: Social cohesion
11. Green economy: Circular economy, Direct economic value of NbS...


Green Roof of Aimé Césaire School Complex

Aimé Césaire Primary School: A Garden Home (Source: urbannext.net/aime-cesaire-primary-school)

In 2013, an experimental and educational project, conceived as a garden home for a school, was built at the heart of the green district known as ‘Duke’s Meadow’ on the Île de Nantes. The building’s roof was covered by 2,700 square meters of natural dunes.

The objective is to create a green roof, relying heavily on a phytosociological approach to plant colonization and high biodiversity, but also a site that is easy to manage.

The originality of its green roof results from a co-construction between architects and landscape designer. Its qualities are undeniable, and this...


Bézannes Joint Development Zone (Reed Bed Park), Storm-water Management Solution

Entrance of the Reed bed Park (Parc de la Roselière)
  • Rainwater management of a 172ha area in response to a waterproofing construction

This NbS is a construction ex nihilo of a landscaped park as alternative stormwater management solution to a traditionnal civil engineering management (tubes). It takes place in a 172ha area in the city of Bézannes (Reims Métropole). This project has been implemented in response to the waterproofing of this area (strong urbanisation level).

The project is caracterized by an artificial river leading to a permanent lagoon and a reed bed. Then a wetland manage the water...


Flood Retention Basins of Lura River, Como Province

Retention basin of Lura park (1)
  • River bank renaturation and stabilization through live staking and vegetated dikes

  • Riparian afforestation

  • Phytodepuration basins

  • ​Zero-energy flood retention system (no pumping needed)

The project consists of the implementation of two rolling basins connected by an open air ditch and a pond filled with ground water. The basins will be temporarely flooded by Lura river during intense rainy periods through natural inlet from the river bed,...


Operatie STEENBREEK

Operation Stone Break (Dutch wordplay) - Source : Operatie SteenBreek Fondation

Operatie Steenbreek  is a foundation that organizes awareness raising campaigns and offers assistance with regards to greening private gardens. Many gardens and streets in the Netherlands are covered with tiles that cannot absorp the rainwater from heavy rainfall.

The idea behind the initiative is to encourage citizens to remove the tiles and stones from their gardens/backyards and replace it with grass, plants and trees for better drainage and to increase the biodiversity.

Thanks to an app., citizens can be adviced and exchange plants with neighbours. Citizens can...


Application of Eco:Actuary in the Thames catchment, UK: A series of tools to operationalise strategic planning and investment for Natural Flood Management. H2020 NAIAD Project.

EcoActuary: an open-access catastrophe model capable of assessing the impact of green infrastructure on local and downstream assets at risk of flood.

Using the widely used Policy Support System tools at www.policysupport.org as a basis, we built an insurance industry-relevant policy support system called Eco:Actuary. The objective of this project is to to co-develop and test the Eco:Actuary with NAIAD project partners & stakeholders in the fluvial non-tidal Thames as a DEMO catchment in the NAIAD project. 

EcoActuary is an open-access catastrophe model capable of assessing the impact of NbS on local and downstream assets at risk of flood.  It simulates a minimum of 1200 spatial...