Improve water quality

Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...


Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...

Promenade along river Danube

  • Develop a concept and implement numerous pilot projects on the riverbank

The main purpose of the project is to design a promande among the Danube quays in Budapest, planting plants, building installations, and awareness rising. The goal is the sharing of the sensation of the Danube in the city, recommending the daily utilization of the river side to citizens.

The project is a good example for the implementation of strategic NBSs, with putting great emphasis on the corporate development and implementation, by creating networks. 

The...


ECO-Park development (Balaton lake) of Balatonfűzfő city

Eco-Park of Balatonfűzfő
  • Development of an ecological park at the lake Balaton

The plans of the municipality and the local civic organzation were to develop a pleasant, ecological park filled with different kind of leisure activities from the neglected gulf.

The objective is a comprehensive reconstruction of the area in Balatonfűzfő, from Fövenyfürdő Beach to Tobruki Beach is enabling the semi-natural utilization of the area near the city and near the lake. This project has two phases:

  1. The first phase a semi-natural promenade with special playground was created
  2. ...

Quay Garden Project - Habitats for Local Species on a City Center River

Quay Gardens - Habitats for local species
  • Implementation of vegetated rafts as habitats for local species on a city center river
  • Using Bio-sourced materials

It aims to implement artificial shelters for fauna (nesting box, insect hotels, artificial spawning areas…) and vegetation supports were installed. Wooden terraces were also installed to allow citizens to enjoy and observe biodiversity. This project is both thought for biodiversity and for citizens and finaly allow cohabitation between them.


Blue Beach Case Study of Valenton (Val de Marne, France), Fertile Soil Construction by Using Recycled Materials

Blue Beach Park Overview

Soil construction with wastes. 

...


Urban Challenges:

1. Climate issues: Climate adaptation
2. Urban water management and quality: Urban water management and quality
4. Urban space and Biodiversity: Urban space management 
5. Urban Regeneration and Soil: Soil management
7. Public health and well-being: Quality of life, Health
8. Environmental justice and social cohesion: Social cohesion
11. Green economy: Circular economy, Direct economic value of NbS...


Bézannes Joint Development Zone (Reed Bed Park), Storm-water Management Solution

Entrance of the Reed bed Park (Parc de la Roselière)
  • Rainwater management of a 172ha area in response to a waterproofing construction

This NbS is a construction ex nihilo of a landscaped park as alternative stormwater management solution to a traditionnal civil engineering management (tubes). It takes place in a 172ha area in the city of Bézannes (Reims Métropole). This project has been implemented in response to the waterproofing of this area (strong urbanisation level).

The project is caracterized by an artificial river leading to a permanent lagoon and a reed bed. Then a wetland manage the water...



Flood Retention Basins of Lura River, Como Province

Retention basin of Lura park (1)
  • River bank renaturation and stabilization through live staking and vegetated dikes

  • Riparian afforestation

  • Phytodepuration basins

  • ​Zero-energy flood retention system (no pumping needed)

The project consists of the implementation of two rolling basins connected by an open air ditch and a pond filled with ground water. The basins will be temporarely flooded by Lura river during intense rainy periods through natural inlet from the river bed,...


Operatie STEENBREEK

Operation Stone Break (Dutch wordplay) - Source : Operatie SteenBreek Fondation

Operatie Steenbreek  is a foundation that organizes awareness raising campaigns and offers assistance with regards to greening private gardens. Many gardens and streets in the Netherlands are covered with tiles that cannot absorp the rainwater from heavy rainfall.

The idea behind the initiative is to encourage citizens to remove the tiles and stones from their gardens/backyards and replace it with grass, plants and trees for better drainage and to increase the biodiversity.

Thanks to an app., citizens can be adviced and exchange plants with neighbours. Citizens can...


Pages