Reduce flood risk

Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...

Fernbrae Meadows Urban Park

Green Infrastructure Strategic Intervention: Fernbrae Meadows

The land was in a vacant and derelict state and safety concerns were raised due to vandalisation, fly tipping, vehicle abandonment and fires. The conversion of the site into a new urban park presented an opportunity to address the anti-social behaviour and make the site a desirable area for positive activities and community development. South Lanarkshire Council provided the match funding for the project and applied for funding from the Green Infrastructure Strategic Intervention (GISI), which was granted in 2017. A ‘friends of’...



Blue Beach Case Study of Valenton (Val de Marne, France), Fertile Soil Construction by Using Recycled Materials

Blue Beach Park Overview

Soil construction with wastes. 

...


Urban Challenges:

1. Climate issues: Climate adaptation
2. Urban water management and quality: Urban water management and quality
4. Urban space and Biodiversity: Urban space management 
5. Urban Regeneration and Soil: Soil management
7. Public health and well-being: Quality of life, Health
8. Environmental justice and social cohesion: Social cohesion
11. Green economy: Circular economy, Direct economic value of NbS...


Bézannes Joint Development Zone (Reed Bed Park), Storm-water Management Solution

Entrance of the Reed bed Park (Parc de la Roselière)
  • Rainwater management of a 172ha area in response to a waterproofing construction

This NbS is a construction ex nihilo of a landscaped park as alternative stormwater management solution to a traditionnal civil engineering management (tubes). It takes place in a 172ha area in the city of Bézannes (Reims Métropole). This project has been implemented in response to the waterproofing of this area (strong urbanisation level).

The project is caracterized by an artificial river leading to a permanent lagoon and a reed bed. Then a wetland manage the water...


Flood Retention Basins of Lura River, Como Province

Retention basin of Lura park (1)
  • River bank renaturation and stabilization through live staking and vegetated dikes

  • Riparian afforestation

  • Phytodepuration basins

  • ​Zero-energy flood retention system (no pumping needed)

The project consists of the implementation of two rolling basins connected by an open air ditch and a pond filled with ground water. The basins will be temporarely flooded by Lura river during intense rainy periods through natural inlet from the river bed,...


Environmental recovery of a quarry ATEg20 - Pozzuolo Martesana, Truccazzano

Quarry restoration ATEg20

This project consists in two main areas :
- the northern portion : object of the first phases of extraction ended in 2007
- the southern portion : subject of the cultivation plan and recovery of recent years
The proposed project involves the areas cultivated in the northern part. It forecast an environmental naturalistic recovery and the conclusion of the overall environmental recovery of the entire extractive area.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use;
•...


Environmental recovery of a quarry ATEg32 - Gaggiano, Trezzano sul Naviglio, Zibido San Giacomo

Quarry restoration ATEg32

This project aims to include : 
• transformation of some portions of agricultural land in wooded strips and recovery of some rows, that were not in a good state of preservation;
• creation of a new area for the relocation of the working installations;
• fulfillment of the existing ecological network and hiding/masking of the extractive areas;
• realization of set-aside fauna;
• realization of a cane thicket with the use of lime arising from the washing of extracted gravel and sands;
• realization of areas for activities with canoe
• creation of an...


Environmental recovery of a quarry ATEg15 Paderno Dugnano

Quarry restoration ATEg15 Paderno Dugnano

The area is characterized by by the presence of two separate lakes connected by a tree-lined pathway. The first lake is used for the fishing while the second one is characterized by a more spontaneous development of wild flora and is the home of different bird species.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use
• putting containment elements of the soil in particularly steep points;
• realization of green ramparts and rows of trees to masking/hiding noise and dust deriving...


Environmental recovery of a quarry ATEg30 Pero

ATEg30 - quarry restoration

The project aims to transform an old quarry in a public park. The project foresees the renaturalization of the lakeshore, the realization of a peninsula, the filling of settling tanks created for the extraction activities and the realization weak slope in the nord sector that want connect the lake with the countryside.
Objectives are to create : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use
• laying turf
• vegetation reconstruction of marsh and riparian environment
• vegetation...