Restoring ecosystems and their functions

Farfalle in ToUr

The project promotes urban butterflies conservation, thanks to the involvement of fragile people as citizen scientists. It aims to create and connect Butterfly oasis, to allow butterflies to cross the city; and to involve people with mental or physical disabilities, to fight the social stigma


Shanxi Qixian Wetland Park Restoration Project -Experience- AFD financed

Project introduction:

The Changyuanhe river is in Qixian, Jinzhong City, Shanxi Province, in North and Middle China and become the main axis of the project, both by its cultural and ecological important for the country. In the past, there were large areas of marsh wetlands along the river, which can regulate and enrich the ecological diversity with good water power. Today the contrast between the upstream natural area (which is still well preserved) and the downstream area (which is dry for four months of the year) is astonished. The project aims to afforest the 30km river...



Mirafiori Sud Living Lab

The project ProGIreg is funded by the European Commission under the Horizon 2020 programme and will run from June 2018 until 2023. ProGIreg stands for ‘productive Green Infrastructure for post-industrial urban regeneration’: nature for renewal. ProGIreg develops self-sustaining business models for nature-based solutions, based on a scientific assessment of the multiple benefits they provide for social, ecological and economic regeneration.Together, local citizens, governments, businesses, NGOs and universities design the nature-based solutions and make them happen.



Habitat enhancement of stone clad sea walls.

Seawalls are usually seen only as flood alleviation structures rather than as having other possible functions to benefit the wide environment. Where new walls are being installed there is opportunity to include more sympathetic “nature friendly” textured finishes to improve or maintain biodiversity. Where seawalls are already installed, retrofit enhancement measures provide significant opportunities. Small alterations were made to the mortar pointing between decorative stone cladding of a section of vertical concrete wall during construction of the Shaldon and Ringmore Tidal Defence Scheme...


NAIAD Case Studies: Glinščica Demonstration Site (Ljubljana, Slovenia)

Glinščica catchment

The aim of Slovenian demo is to prepare a comparison of Nature based solutions and grey scenarios for the Glinščica catchment area, valuate the ecosystem services provided by implementation of restoration and management measures developed within the project and to develop and deploy economic and/or financial instruments (in the form of nature assurance schemes) for effective business models in the field of ecosystem services, green infrastructure and river restoration that would highlight the importance of understanding the value of ecosystems in the long run.


Integrated green grey infrastructure (IGGI) - Green screen guard rail.

Air quality in urban areas is a known issue for health and quality of life. Motorised vehicles produce a range of pollutants that can affect human health. These include very small particles emitted from exhaust (especially from diesel-fuelled vehicles), and from wear-and-tear on brakes and tyres. If inhaled these particles can cause a range of both short-term and more chronic health problems, including increased chances of death from respiratory and cardiovascular disease. This Particulate Matter (PM) is measured in microns (one micron is one millionth of a metre). Health concerns start...


Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...


Pages